Saturday, October 12, 2013

The List

After sorting out the landscaping, well the design of it ... then it was a question of what to do next...

This is when the list was drawn up...

1:   Build a Fence to keep Orian away from the front door
2:   Paint the inside of the house - Brought paint, just need to do the painting
3:   Install Grid Connected Solar - COMPLETED
4:   New Shower in the main bathroom - COMPLETED
5:   New rangehood in the kitchen - Brought the rangehood, just need ducting and to install
6:   New curtains for the lounge - COMPLETED
7:   Restain the decking timber - Brought the stain, just need to do the staining
8:   Landscaping

Kitchen
Stage 1 - Prior to moving into house
1:   Buy F&P 900mm silver rangehood - COMPLETED
Stage 2 - Before Jan 2014
2:   Buy ducting and install rangehood
3:   Remove Curtain
4:   Paint walls Resene Double Blanc
5:   Paint ceiling & trim Resene Alabaster
6:   Paint kitchen cupboards Resene Lynch
Stage 3 - Sometime after Jan 2014
7:   Install lazy susan in corner cupboards under bench
8:   Install pop up 4 power point multi box in bench
9:   Buy and install sun blinds
10: Replace light fitting
11: Replace light switch and shade
12: Replace electric power points
13: Buy & install USB electric power point
14: Replace window with bifold double glazed window
15: Resign kitchen

Dining Room
Stage 1 - Prior to moving into house
Nothing
Stage 2 - Before Jan 2014
1:   Fix crack in ceiling
2:   Paint walls Resene Double Blanc
3:   Paint ceiling & trim Resene Alabaster
4:   Remove carpet and replace with vynal or wood flooring.
Stage 3 - Sometime after Jan 2014
5:   Replace curtains
6:   Replace light fitting
7:   Replace light switch and shade
8:   Replace electric power points
9:   Buy & install USB electric power point
10: Replace ranch slider with bifold doors including double glazed glass

Lounge
Stage 1 - Prior to moving into house
1:   Have curtains made for lounge - COMPLETED
Stage 2 - Before Jan 2014
2:   Fix crack in ceiling
3:   Paint walls Resene Double Blanc
4:   Paint ceiling & trim Resene Alabaster
Stage 3 - Sometime after Jan 2014
5:   Replace light fitting
6:   Replace light switch and shade
7:   Replace electric power points
8:   Replace carpet
9:   Replace ranch slider with bifold doors including double glazed glass
10: Replace two southern windows with large bifold doors once garage extensions complete

Master Bedroom
Stage 1 - Prior to moving into house
1:   Fix ranch slider water damage - COMPLETED
Stage 2 - Before Jan 2014
2:   Fix crack in ceiling
3:   Paint walls Resene Double Blanc
4:   Paint ceiling & trim Resene Alabaster
Stage 3 - Sometime after Jan 2014
5:   Replace light fitting
6:   Replace light switch and shade
7:   Replace electric power points
8:   Buy & install USB electric power point
9:   Buy new curtains
10: Replace carpet
11: Replace ranch slider with bifold doors including double glazed glass
12: Buy new bedroom manchester set

Walk in Wardrobe
Stage 1 - Prior to moving into house
Nothing
Stage 2 - Before Jan 2014
1:   Fix broken shelves
2:   Paint walls Resene Blanc
3:   Paint ceiling & trim Resene Alabaster
Stage 3 - Sometime after Jan 2014
4:   Replace light fitting
5:   Replace light switch and shade
6:   Replace carpet
7:   Replace wardrobe organiser

Ensuite
Stage 1 - Prior to moving into house
Nothing
Stage 2 - Before Jan 2014
1:   Remove curtain
2:   Paint walls Resene White Pointer
3:   Paint ceiling & trim Resene Alabaster
4:   Install extractor fan
Stage 3 - Sometime after Jan 2014
5:   Replace shower with tile shower
6:   Replace vanity
7:   Replace toilet
8:   Replace mirror with mirror cabinet
9:   Replace vinyl flooring

Office
Stage 1 - Prior to moving into house
Nothing
Stage 2 - Before Jan 2014
1:   Fix crack in ceiling
2:   Paint walls Resene Double Blanc
3:   Paint ceiling & trim Resene Alabaster
4:   Buy & install wall paper mural
Stage 3 - Sometime after Jan 2014
5:   Replace light fitting
6:   Replace light switch and shade
7:   Replace electric power points
8:   Buy & install USB electric power point
9:   Buy new curtains
10: Fill in doorway between kitchen and office
11: Replace carpet
12: Replace ranch slider with bifold doors including double glazed glass

Scott's Room
Stage 1 - Prior to moving into house
Nothing
Stage 2 - Before Jan 2014
1:   Paint 3 Walls Resene Spanish White
2:   Paint feature wall Resene Havelock Blue
3:   Paint Ceiling & Trim Resene Alabaster
4:   Make and put up new Lightening McQueen Curtains
5:   Make up and paint two 3 shelf bookshelf Dulux Opua & Dulux Rai Valley
Stage 3 - Sometime after Jan 2014
6:   Replace light switch  and shade
7:   Replace electric power points
8:   Buy & install USB electric power point
9:   Install wardrobe organiser
10: Replace carpet

Kalvin's Room
Stage 1 - Prior to moving into house
Nothing
Stage 2 - Before Jan 2014
1:   Paint 3 Walls Resene Spanish White
2:   Paint feature wall Resene Havelock Blue
3:   Paint Ceiling & Trim Resene Alabaster
4:   Install Lightening McQueen Curtains
5:   Make up and paint three 3 shelf bookshelf Dulux Opua & Dulux Rai Valley
Stage 3 - Sometime after Jan 2014
6:   Replace light switch and shade
7:   Replace electric power points
8:   Buy & install USB electric power point
9:   Install wardrobe organiser
10: Replace carpet

Main Bathroom
Stage 1 - Prior to moving into house
1:   Replace main shower - COMPLETED
      -   Englefield Sapphire, Methven Kiri Shower & Mixer
Stage 2 - Before Jan 2014
2:   Remove Curtain in window
3:   Paint Walls Resene White Pointer
4:   Paint Ceiling Resene Alabaster
Stage 3 - Sometime after Jan 2014
5:   Replace light switch
6:   Replace extracter fan
7:   Replace Vanity
8:   Replace Bath
9:   Replace vinyl flooring
10: Add window on Southern Wall
11: Increase size of window on Eastern Wall

Toilet
Stage 1 - Prior to moving into house
Nothing
Stage 2 - Before Jan 2014
1:   Remove Curtain in window
2:   Paint Walls Resene White Pointer
3:   Paint Ceiling Resene Alabaster
Stage 3 - Sometime after Jan 2014
4:   Replace light switch
5:   Replace vanity
6:   Replace toliet
7:   Replace mirror
8:   Replace vinyl flooring

Laundry
Stage 1 - Prior to moving into house
1:   Buy a front loader washing machine - COMPLETED
2:   Buy a Auto senser dryer - COMPLETED
Stage 2 - Before Jan 2014
3:   .Remove Curtain in windown
4:   Remove Curtain from door
5:   Determine what the electrical boxes are in the laundry
6:   Move fuse box so that it will be inside laundry cupboard
7:   Move alarm box into ceiling
8:   Paint Walls Resene White Pointer or Blanc
9:   Paint Ceiling Resene Alabaster
Stage 3 - Sometime after Jan 2014
10:  Replace light switch
11:  Replace power points
12:  Replace back door with new door with double glazed glass
13:  Remove window in laundry
14:  Install bench with inbuilt sink and cupboard in front of sink & laundry draw on other side
15:  Install dryer on the wall
16:  Install cupboards either side of dryer
17:  Replace vinyl flooring

Under Stairs Cupboard
Stage 1 - Prior to moving into house
Nothing
Stage 2 - Before Jan 2014
1:   Paint walls Resene White Pointer
2:   Paint ceiling & trim Resene Alabaster
3:   Add shelving & coat hocks
Stage 3 - Sometime after Jan 2014
4:   Replace light fitting
5:   Replace light switch and shade

Garage
Stage 1 - Prior to moving into house
Nothing
Stage 2 - Before Jan 2014
1:   Replace net curtain
2:   Paint Walls Resene Forget Me Not
3:   Paint Ceiling Resene Alabaster
4:   Install new work shelving
5:   Install new metal cupboard
Stage 3 - Sometime after Jan 2014
6:   Replace light switch
7:   Replace power points
8:   Extend garage 6 m South
      -  Include build in workbench, cupboards

Well isn't this is a long long wish list, will be interesting to see how far we get in a year and whether we get all the jobs completed by 31 Dec 2013 that we want to get done.

Landscaping is on another page.

No comments:

Post a Comment