After sorting out the landscaping, well the design of it ... then it was a question of what to do next...
This is when the list was drawn up...
1: Build a Fence to keep Orian away from the front door
2: Paint the inside of the house -
Brought paint, just need to do the painting
3: Install Grid Connected Solar -
COMPLETED
4: New Shower in the main bathroom -
COMPLETED
5: New rangehood in the kitchen -
Brought the rangehood, just need ducting and to install
6: New curtains for the lounge -
COMPLETED
7: Restain the decking timber -
Brought the stain, just need to do the staining
8: Landscaping
Kitchen
Stage 1 - Prior to moving into house
1: Buy F&P 900mm silver rangehood -
COMPLETED
Stage 2 - Before Jan 2014
2: Buy ducting and install rangehood
3: Remove Curtain
4: Paint walls Resene Double Blanc
5: Paint ceiling & trim Resene Alabaster
6: Paint kitchen cupboards Resene Lynch
Stage 3 - Sometime after Jan 2014
7: Install lazy susan in corner cupboards under bench
8: Install pop up 4 power point multi box in bench
9: Buy and install sun blinds
10: Replace light fitting
11: Replace light switch and shade
12: Replace electric power points
13: Buy & install USB electric power point
14: Replace window with bifold double glazed window
15: Resign kitchen
Dining Room
Stage 1 - Prior to moving into house
Nothing
Stage 2 - Before Jan 2014
1: Fix crack in ceiling
2: Paint walls Resene Double Blanc
3: Paint ceiling & trim Resene Alabaster
4: Remove carpet and replace with vynal or wood flooring.
Stage 3 - Sometime after Jan 2014
5: Replace curtains
6: Replace light fitting
7: Replace light switch and shade
8: Replace electric power points
9: Buy & install USB electric power point
10: Replace ranch slider with bifold doors including double glazed glass
Lounge
Stage 1 - Prior to moving into house
1: Have curtains made for lounge -
COMPLETED
Stage 2 - Before Jan 2014
2: Fix crack in ceiling
3: Paint walls Resene Double Blanc
4: Paint ceiling & trim Resene Alabaster
Stage 3 - Sometime after Jan 2014
5: Replace light fitting
6: Replace light switch and shade
7: Replace electric power points
8: Replace carpet
9: Replace ranch slider with bifold doors including double glazed glass
10: Replace two southern windows with large bifold doors once garage extensions complete
Master Bedroom
Stage 1 - Prior to moving into house
1: Fix ranch slider water damage -
COMPLETED
Stage 2 - Before Jan 2014
2: Fix crack in ceiling
3: Paint walls Resene Double Blanc
4: Paint ceiling & trim Resene Alabaster
Stage 3 - Sometime after Jan 2014
5: Replace light fitting
6: Replace light switch and shade
7: Replace electric power points
8: Buy & install USB electric power point
9: Buy new curtains
10: Replace carpet
11: Replace ranch slider with bifold doors including double glazed glass
12: Buy new bedroom manchester set
Walk in Wardrobe
Stage 1 - Prior to moving into house
Nothing
Stage 2 - Before Jan 2014
1: Fix broken shelves
2: Paint walls Resene Blanc
3: Paint ceiling & trim Resene Alabaster
Stage 3 - Sometime after Jan 2014
4: Replace light fitting
5: Replace light switch and shade
6: Replace carpet
7: Replace wardrobe organiser
Ensuite
Stage 1 - Prior to moving into house
Nothing
Stage 2 - Before Jan 2014
1: Remove curtain
2: Paint walls Resene White Pointer
3: Paint ceiling & trim Resene Alabaster
4: Install extractor fan
Stage 3 - Sometime after Jan 2014
5: Replace shower with tile shower
6: Replace vanity
7: Replace toilet
8: Replace mirror with mirror cabinet
9: Replace vinyl flooring
Office
Stage 1 - Prior to moving into house
Nothing
Stage 2 - Before Jan 2014
1: Fix crack in ceiling
2: Paint walls Resene Double Blanc
3: Paint ceiling & trim Resene Alabaster
4: Buy & install wall paper mural
Stage 3 - Sometime after Jan 2014
5: Replace light fitting
6: Replace light switch and shade
7: Replace electric power points
8: Buy & install USB electric power point
9: Buy new curtains
10: Fill in doorway between kitchen and office
11: Replace carpet
12: Replace ranch slider with bifold doors including double glazed glass
Scott's Room
Stage 1 - Prior to moving into house
Nothing
Stage 2 - Before Jan 2014
1: Paint 3 Walls Resene Spanish White
2: Paint feature wall Resene Havelock Blue
3: Paint Ceiling & Trim Resene Alabaster
4: Make and put up new Lightening McQueen Curtains
5: Make up and paint two 3 shelf bookshelf Dulux Opua & Dulux Rai Valley
Stage 3 - Sometime after Jan 2014
6: Replace light switch and shade
7: Replace electric power points
8: Buy & install USB electric power point
9: Install wardrobe organiser
10: Replace carpet
Kalvin's Room
Stage 1 - Prior to moving into house
Nothing
Stage 2 - Before Jan 2014
1: Paint 3 Walls Resene Spanish White
2: Paint feature wall Resene Havelock Blue
3: Paint Ceiling & Trim Resene Alabaster
4: Install Lightening McQueen Curtains
5: Make up and paint three 3 shelf bookshelf Dulux Opua & Dulux Rai Valley
Stage 3 - Sometime after Jan 2014
6: Replace light switch and shade
7: Replace electric power points
8: Buy & install USB electric power point
9: Install wardrobe organiser
10: Replace carpet
Main Bathroom
Stage 1 - Prior to moving into house
1: Replace main shower -
COMPLETED
-
Englefield Sapphire, Methven Kiri Shower & Mixer
Stage 2 - Before Jan 2014
2: Remove Curtain in window
3: Paint Walls Resene White Pointer
4: Paint Ceiling Resene Alabaster
Stage 3 - Sometime after Jan 2014
5: Replace light switch
6: Replace extracter fan
7: Replace Vanity
8: Replace Bath
9: Replace vinyl flooring
10: Add window on Southern Wall
11: Increase size of window on Eastern Wall
Toilet
Stage 1 - Prior to moving into house
Nothing
Stage 2 - Before Jan 2014
1: Remove Curtain in window
2: Paint Walls Resene White Pointer
3: Paint Ceiling Resene Alabaster
Stage 3 - Sometime after Jan 2014
4: Replace light switch
5: Replace vanity
6: Replace toliet
7: Replace mirror
8: Replace vinyl flooring
Laundry
Stage 1 - Prior to moving into house
1: Buy a front loader washing machine - COMPLETED
2: Buy a Auto senser dryer -
COMPLETED
Stage 2 - Before Jan 2014
3: .Remove Curtain in windown
4: Remove Curtain from door
5: Determine what the electrical boxes are in the laundry
6: Move fuse box so that it will be inside laundry cupboard
7: Move alarm box into ceiling
8: Paint Walls Resene White Pointer or Blanc
9: Paint Ceiling Resene Alabaster
Stage 3 - Sometime after Jan 2014
10: Replace light switch
11: Replace power points
12: Replace back door with new door with double glazed glass
13: Remove window in laundry
14: Install bench with inbuilt sink and cupboard in front of sink & laundry draw on other side
15: Install dryer on the wall
16: Install cupboards either side of dryer
17: Replace vinyl flooring
Under Stairs Cupboard
Stage 1 - Prior to moving into house
Nothing
Stage 2 - Before Jan 2014
1: Paint walls Resene White Pointer
2: Paint ceiling & trim Resene Alabaster
3: Add shelving & coat hocks
Stage 3 - Sometime after Jan 2014
4: Replace light fitting
5: Replace light switch and shade
Garage
Stage 1 - Prior to moving into house
Nothing
Stage 2 - Before Jan 2014
1: Replace net curtain
2: Paint Walls Resene Forget Me Not
3: Paint Ceiling Resene Alabaster
4: Install new work shelving
5: Install new metal cupboard
Stage 3 - Sometime after Jan 2014
6: Replace light switch
7: Replace power points
8: Extend garage 6 m South
- Include build in workbench, cupboards
Well isn't this is a long long wish list, will be interesting to see how far we get in a year and whether we get all the jobs completed by 31 Dec 2013 that we want to get done.